The true cost of CLT (Cross-Laminated Timber) becomes clear when the project is viewed as a whole. Time savings, lighter foundation requirements, reduced site overheads, fewer finishing works, and high energy performance often make CLT more competitive than traditional methods.
Parameter | CLT | Concrete | Steel |
---|---|---|---|
Frame construction time | Fast | Slow | Medium |
Structural weight | ~430–500 kg/m³ | ~2,300–2,500 kg/m³ | ~7,850 kg/m³ |
Foundations | Smaller | Larger | Medium |
Seismic performance | Resilient & light | Heavy | Ductile but heavy |
Fit-out | Exposed timber | Plaster – paint | Additional claddings |
Embodied carbon | Low | High | High |
18 floors, Canada — erection in 66 days.
10 floors, London — construction time reduced by 40%.