CLT Cost & Construction Time

CLT Cost & Construction Time

The true cost of CLT (Cross-Laminated Timber) becomes clear when the project is viewed as a whole. Time savings, lighter foundation requirements, reduced site overheads, fewer finishing works, and high energy performance often make CLT more competitive than traditional methods.

CLT cost factors

Cost factors

  • Faster erection (up to 50%): fewer labor days, quicker project operation.
  • Lighter foundations (up to 80% less weight).
  • Prefabricated CNC panels: lower site expenses.
  • Reduced finishing works: timber surfaces can remain exposed.
  • High energy performance: up to 40% lower consumption.
  • Faster return on investment (ROI): projects delivered months earlier.

Comparison: CLT – Concrete – Steel

Parameter CLT Concrete Steel
Frame construction timeFastSlowMedium
Structural weight~430–500 kg/m³~2,300–2,500 kg/m³~7,850 kg/m³
FoundationsSmallerLargerMedium
Seismic performanceResilient & lightHeavyDuctile but heavy
Fit-outExposed timberPlaster – paintAdditional claddings
Embodied carbonLowHighHigh
Single-family house 120–150 m²
Frame completion: in 2–3 days
Duplex / small hotel 400–500 m²
Completion: 2–3 weeks
Buildings of 4–5 floors
Load-bearing structure: 4–5 weeks
Brock Commons

Brock Commons

18 floors, Canada — erection in 66 days.

Dalston Works

Dalston Works

10 floors, London — construction time reduced by 40%.